loader

Energetic

Energetic

Ecolsdb

Bathroom: learning about electrical wiring

This bathroom platform is intended for the realization of an electrical installation in the various volumes of this one.
It is equipped with a frame, including three useful faces, the face "washbasin", the face "shower" and the face GTL. The last face allows, via a trap door, to give access to the interior of the structure.
This system allows learning in four main areas of activity:
- Prepare the realization of an installation
- Carry out the installation
- Commissioning and adjusting the installation
- Communicating

These areas of activity correspond in all respects to the references for the Bac Pro in Energy.